arrow_back
Container Unloading OperationsActivity ID: act-p-unload-2
Tally Inspection
KPI Focus
paymentsVessel Turnaround Time
Assigned PositionManager Yard Operation
System Status
Active Monitoring
Workload Calculation
speedFrequency22 / week
Duration57 min / occurrence
Total Workload
20.9 Hours/Week
Headcount Analysis
groupsRequired HC0.52 FTE
Actual HC5 FTE
Gap AnalysisOVERSTAFFED
+4.48 FTE
Utilization
data_usage9%Workload index
Derived from shared workload rules: weekly volume × duration, compared to roster in Manager Yard Operation.
Assigned Personnel
Resource allocation for this activity.
search
| Employee | Designation | Load |
|---|---|---|
| Agus Maharani | Manager Yard Operation | 97% |
| Yuni Ramadhan | Manager Yard Operation | 89% |
| Joko Saputra | Manager Yard Operation | 65% |
| Taufik Hakim | Manager Yard Operation | 62% |
| Sinta Wijaya | Manager Yard Operation | 71% |